Gå til hovedinnhold

Wastewater Treatment Plant Linnes RA

SPOT ENGINEERING is designing the expansion of Linnes Wastewater Treatment Plant, including piping systems, structure, and layout.

SPOT ENGINEERING has been commissioned to carry out the detailed design of the piping systems, structure, and layout for the expansion of the Linnes Wastewater Treatment Plant. The project will be executed during the 2025–2026 period and represents an important step in increasing the plant’s capacity and efficiency.

The scope includes 3D modelling of new installations, preparation of production documentation such as drawings and isometrics, as well as close follow-up during the production phase. The project demands high precision and seamless integration with the existing facility, and we look forward to contributing with our technical expertise and experience from similar projects.